Supply + Demand · Under construction
Stegra Steel Plant
Boden, Europe, SE
由 HydrogenReady.com 团队发布
Founded in 2020, Stegra was created with the purpose to decarbonize hard-to-abate industry, starting with steel.

Stegra plant is under construction in Boden in northern Sweden. It's on track to produce green steel by 2026, using green hydrogen and green iron to slash emissions by up to 95%. The electrolysis capacity in Boden, Sweden, is to 740 MW, powered by 37 large 20 MW alkaline electrolyzer modules supplied by Thyssenkrupp Nucera
Hydrogen Supply
- Planned commercial start
- 2026
- Actual start
- Not specified
- Initial annual volume
- 100,000 t H₂/year
- Initial volume year
- 2027
- Target annual volume
- 5,000,000 t H₂/year
- Target year
- 2030
- Available to new buyers
- Not disclosed
Hydrogen Demand
- Planned commercial start
- 2026
- Actual start
- Not specified
- Initial annual volume
- 100,000 t H₂/year
- Initial volume year
- 2027
- Target annual volume
- 5,000,000 t H₂/year
- Target year
- 2030
- Uncontracted demand
- Not disclosed
Project characteristics
- Demand sectors
- Iron and Steel
- Production technology
- Water electrolysis
- Carbon capture
- None
- Electrolyser capacity
- 740 MW
- Nameplate capacity
- 100000 t H₂/year
Looking for
Not specified
Editorially compiled data. Editorial approval is not technical certification. Last updated:
Official project source ↗