Supply · Under construction
Onuba — Andalusian Green Hydrogen Valley, Phase 1
Palos de la Frontera, Huelva, Andalusia, ES
Publicado por el equipo de HydrogenReady.com
A 300 MW renewable hydrogen project under construction at Moeve’s Huelva energy park, designed to supply industrial processes and renewable fuel production.

Onuba is the first development phase of the Andalusian Green Hydrogen Valley. It will use alkaline electrolysis supplied by thyssenkrupp nucera, comprising fifteen 20 MW units. Hydrogen will support industrial decarbonisation and fuel production. The initial installation is distinct from the wider valley’s planned 2 GW capacity and includes an option for a further 105 MW. The initial facility has a nominal hydrogen production capacity of approximately 45,000 tonnes per year. This is production capacity, not a confirmed volume available for external offtake. Sources: https://www.moeveglobal.com/en/press/moeve-launches-largest-green-hydrogen-project-andalusian-valley https://www.moeveglobal.com/en/press/moeve-thyssenkrupp-nucera-electrolyzers-green-hydrogen-onuba Editorial information reviewed on 17 November 2026.
Hydrogen Supply
- Planned commercial start
- Not yet determined
- Actual start
- Not specified
- Initial annual volume
- Not yet determined
- Initial volume year
- —
- Target annual volume
- Not yet determined
- Target year
- —
- Available to new buyers
- Not disclosed
Project characteristics
- Production technology
- Water electrolysis
- Energy sources
- Not specified
- Carbon capture
- None
- Electrolyser capacity
- 300 MW
- Nameplate capacity
- 45000 t H₂/year
- Additional details
- Alkaline water electrolysis; industrial integration with refining and renewable fuels. Renewable electricity is planned; the detailed electricity supply mix is not confirmed in the reviewed announcement.
- Partners and roles
- Moeve — lead developer, 51%. Hy24 and COFIDES — combined 29%. Enagás Renovable and Alter Enersun — remaining 20%. thyssenkrupp nucera — electrolysis equipment supplier.
- Permits, financing and offtake milestones
- FID announced in March 2026. Electrolyser supply contract announced on 18 March 2026. Construction launch confirmed on 17 September 2026. Investment exceeds €1 billion, including associated infrastructure.
Looking for
Not specified
Editorially compiled data. Editorial approval is not technical certification. Last updated:
Official project source ↗